How the platform works
The console connects a site's data to market prices and rules, shows where the money goes, and plans every hour. This page shows the screens, the method and the data behind them.
- Markets
- ERCOT (Texas), NORD zone (Italy)
- Users
- Energy managers, finance, plant operators, producers
- Plan horizon
- 48 hours, solved again every hour
- Solver
- Mixed-integer program (HiGHS)
- Mode
- Advisory, read-only
- Exports
- CSV, JSON and a printable report
The screens
Six views of one site
All screenshots come from the working console, on the modeled reference AI campus and a modeled Texas solar plant. Prices are real; site figures are modeled and labelled as such.
The overview answers three questions: what the site used and made today, what it cost, and what the plan did differently from the usual operating rule. A one-line brief sums up the day in plain words.
Each hour gets one decision: run on site, buy from the grid, mix the two, or curtail flexible load. The plan shows why. At 19:00 the grid cost more than the $1,000/MWh a megawatt-hour of compute is worth to the site, and the engines were already at full output.
Texas changes its large-load rules often. The console tracks 15 of them, from SB 6 curtailment directives to ride-through requirements, and marks each one as applying, to check, or pending, using the site's own size and equipment.
Method
How the plan is made
A forecast, an optimizer and a rule for re-planning. The same engine runs the backtests on this website.
-
00:00 daily
Forecast
Gradient-boosted models forecast 48 hours of real-time prices from data known at the time, including ERCOT's day-ahead price for the next 24 hours. Quantile models give P10, P50 and P90 bands.
-
Each solve
Optimize
A mixed-integer program decides engine on and off, output, battery and curtailment to minimize energy cost plus lost production, within the grid limit and every unit's limits.
-
Every hour
Re-plan
With the hour's actual price known and the forecast for later hours, it solves again and applies only the current hour.
-
June to September
Peak charges
Expected transmission charges are added to grid imports in the hours most likely to set each month's ERCOT peak.
What every plan respects
Plans that ignore how plants actually run look good on paper and fail on site. These limits are in the model.
- Start costs, minimum up and down times, and warm-up: a unit gives only part of its output in the hour it starts.
- Minimum stable load, part-load efficiency and ramp limits.
- Process heat from CHP or an auxiliary boiler, with dumped heat counted.
- Permit hours and penalties on emergency-only units.
- Battery power, energy and wear.
- Carbon costs, white certificates and monthly peak power charges for Italian sites.
- Units out for maintenance.
One limit of the current backtest, stated plainly: ERCOT's archived load forecasts were not available, so the peak-hour risk in the backtest uses actual load with 2% noise. A live service needs forecasts made only from data known at the time, and we will rerun the peak-charge results on those before we quote them to you.
Data
What the console runs on
Public market and plant data are real. Sites, their equipment and loads are modeled until we work with your own data.
| Data | Source | Coverage | Status |
|---|---|---|---|
| Hub prices, real-time and day-ahead | ERCOT, HB_HUBAVG | May 2024 to Aug 2026, hourly | Real |
| System load and generation by fuel | EIA-930 | Hourly | Real |
| Grid carbon intensity | Calculated from EIA-930 fuel mix | Hourly | Estimate |
| Gas price | EIA, Henry Hub spot | Daily | Real |
| Weather | NOAA airport stations via Iowa Environmental Mesonet | Hourly, 19 Texas stations | Real |
| Small producers in ERCOT | EIA-860M via PUDL | 144 plants up to 100 MW | Real |
| Italian prices and fuels | NORD day-ahead, PSV gas, EU carbon allowances | Hourly and daily | Real |
| Sites, equipment and loads | International Batteries reference models | Built from public specifications | Modeled |
| Your meter, bills and equipment | You, read-only | 15-minute or hourly | Yours |
Texas market prices: Source: ERCOT. ERCOT does not endorse this website. EIA data is public domain.